For sale commercial 577 m² Loket
- Price 24 000 000 CZK for property
- včetně provize
description
Exclusive offer of a multifunctional complex with great potential for use. This property ensemble, situated on a plot of 2,938 m², has been operated as a microbrewery with a beer club, a farm shop, and accommodation. Thanks to its versatility, the future use of the facility could be highly diverse, such as a recreational farm with a possible workshop or business space, where the barn can be used for storage; a production facility with a company store, a corporate office with a canteen and apartments; an accommodation facility with a restaurant, a wedding venue, or a location for team building.
The complex is strategically located near the D1 highway (EXIT 66). The village is generally quiet with three access roads. The road from the highway can also be used by trucks. The complex is close to the Švihov (Želivka) water reservoir—a protected area, located in the tourist triangle of Zruč nad Sázavou, Vlašim, Ledeč nad Sázavou, directly on a bike path.
The property set includes two new buildings and an original barn. The brewery/production building is made of solid concrete, soundproof, and meets all hygienic standards for food production. This building also includes accommodation and additional facilities for employees. Heating is currently provided by a recuperation unit, with preparations made for the installation of radiators. In another brick building (house), there is a "beer club", a kitchen, sanitary facilities, a shop, an office, and furnished apartments. Heating is provided by a heat pump with underfloor heating. Additionally, on the plot, there is an original barn structure prepared for further expansion of the complex's use. According to the project – building permit, the barn was intended as a restaurant with 4 apartments.
From a construction and materials standpoint, the complex is of a high standard, and it has been successful in preserving the appearance of the original rural building—some materials were reused during reconstruction.
The complex is connected to the municipal water supply but also has its own well. Household waste is managed through a sewage treatment plant and interventions. Brewery waste accumulates in tanks. The house has one cooled room and a built setup for installing air conditioning units inside and outside all rooms. The family house has an energy label category B. The production building has two cooled rooms, a powerful recuperation unit that heats and cools the entire space, and preparations made for installing radiators.
There are 12 parking spaces on the property, a cellar, and a large grassy area that offers additional possibilities for expansion and use of the entire complex.
The complex – production facility is currently in a trial operation and will be commissioned with the possibility of considering the buyer’s needs.
For more information, please do not hesitate to contact us.
- Last update 16.04.2024
- Contract ID 4718
- Flooring 577 m²
- Property dimensions 2938 m²
- Construction type mixed
- Property condition new build
- Location centre
- Sewerage purifier
- Energy class G (>256 kWh/m²/year)